Office Space In New York
168th Street
-
Bedrooms
NA
-
Bathrooms
1
-
Parking
1

The Toledo Solar Power Plant is located in Toledo in the Island of Cebu. The plant can produce 60 MW of electricity, which can power more than 48,000 households. X’WELL conducted in house laboratory tests and on site Field Density Test of the embankment.
SLEX TR-4, a four-lane toll road stretching 66.74 km from Sto. Tomas, Batangas to Lucena City in Quezon. This ongoing infrastructure project promises to revolutionize travel in Southern Luzon. X’WELL TSI was engaged to conduct inhouse laboratory testing, Field density test of embankments and Compressive Strength of Concrete samples for its concrete structures.
The Cabulig hydroelectric power plant project located in northern Plaridel, Misamis Oriental with a nominal capacity of 8.0 MW. The main components of the run-of-river type hydropower plant includes a low concrete dam to allow the diversion of water onto the headwork’s, an intake weir, headrace canal, forebay and desilting basin, penstock, a powerhouse that encloses two (2) Francis-type tur- bines connected to two (2) generators, and a tailrace canal. x’WELL TSI was engaged to conduct in house laboratory and on site tests of the project requirements.
Don't have an account? Sign Up