preloader

Cabulig Hydroelectric Power Plant

The Cabulig hydroelectric power plant project located in northern Plaridel, Misamis Oriental with a nominal capacity of 8.0 MW. The main components of the run-of-river type hydropower plant includes a low concrete dam to allow the diversion of water onto the headwork’s, an intake weir, headrace canal, forebay and desilting basin, penstock, a powerhouse that encloses two (2) Francis-type tur- bines connected to two (2) generators, and a tailrace canal.
x’WELL TSI was engaged to conduct in house laboratory and on site tests of the project requirements.

User Login

Lost your password?